Focus on Complete Turn-key Production Line Solutions

XGFD 50-50-12/15 Industrial Beverage Filling Machine for Carbonated PET Bottles

This beverage filling machine suits large beverage factories, high-volume bottlers and fast-growing mid-size plants running carbonated PET lines.

Model: XGFD 50-50-12/15

Capacity: 19,000 – 20,000 BPH

Bottle Size: 100-2000ml

Bottle Type: PET Bottles

Carbonated soft drinks (cola, lemon-lime and flavored soda) Sparkling water and soda water Carbonated energy drinks

* We will reply to you within a maximum of 24 hours

3-in-1 Monoblock Design

Rinsing, isobaric filling and capping in one frame save floor space and cut bottle transfers, a compact core for any PET bottling line.

Isobaric Filling Precision

Equal-pressure filling holds CO₂ in the drink and limits foam, so every bottle reaches a uniform fill height at top line speed.

PLC Touch Screen Control

Touch-screen PLC controls speed and monitoring; quick-change parts and capping molds let this high speed filling machine switch sizes fast.

Hygienic & Energy Saving

SUS304 contact surfaces and an 11.0 kW main motor keep cleaning and power costs low per bottle, delivering fast returns at large volumes.

Technical Specifications

Parameter XGFD 50-50-12/15 Beverage Filling Machine
Monoblock Configuration 50 Rinsing Heads / 50 Filling Valves / 12 or 15 Capping Heads
Filling Type Isobaric (Equal-Pressure) Filling
Production Capacity (500ml) 19,000 – 20,000 Bottles/Hour (BPH)
Applicable Bottle Volume 100ml – 2000ml (Option up to 2500ml)
Applicable Bottle Diameter Φ50mm – Φ100mm
Applicable Bottle Height H = 150mm – 340mm
Cap Type & Neck Spec Plastic Screw Cap (Φ20mm – Φ50mm)
Main Motor Power 11.0 kW
Power Supply Standard 220V ~ 480V, 3-Phase, 50Hz / 60Hz (Customizable)
Machine Dimensions (LxWxH) 5.45m × 3.3m × 2.6m
Machine Weight 9,800 kg
Frame Material SUS304 Stainless Steel

Beverage Filling Machine Detail Display

navan machine Rinsing Station

Rinsing Station

Neck grippers hold each PET bottle and flip it 180°, so the 50 rinsing heads flush the inside of the bottle clean before it reaches the filling valves.

navan machine Filling Station

Filling Station

50 isobaric filling valves match bottle pressure to the tank, holding CO₂ in the drink and limiting foam. Swap change parts to fit other bottle volumes.

navan machine Capping Station

Capping Station

12 or 15 capping heads (per configuration) tighten plastic screw caps firmly without cap damage. Swap capping molds to fit different bottle necks.

Bottling Line

We are committed to turnkey projects for filling production lines. If you need any machines on the production line, you can contact us

navan machine bottling line diagram

Frequently Asked Questions

Replace the change parts on the filling valves and swap the capping molds, then adjust the station heights. The rinsing heads clean the inside of any bottle in the supported range.

Isobaric filling pressurizes the bottle to match the tank before liquid flows in, so CO₂ stays dissolved and foaming is limited. Fill levels stay uniform bottle after bottle.

Production normally takes 30–60 days depending on the configuration and quantity. Shipping time depends on your destination port (usually Shanghai or Ningbo).

We offer optional engineer dispatch for installation and staff training, a 1-year guarantee and free lifelong technical support. Service sites in Rwanda and Moscow provide local support.

Yes. We deliver turnkey projects from A to Z, including a PET bottle blow molding machine, labeling, packing and palletizing. See our carbonated drink production line solution.