XGF 24-24-8 High-Speed Water Bottling Line for PET Bottles
The Navan XGF 24-24-8 water bottling line is built for large-scale mineral water manufacturers and commercial bottling facilities.
Model: XGF 24-24-8
Capacity: 10,000-12,000 BPH
Bottle Size: 100-2000ml
Bottle Type: PET Bottles
* We will reply to you within a maximum of 24 hours
3-in-1 Monoblock Design
Combines bottle rinsing, gravity filling, and capping into a unified compact frame to save floor space.
Precision Filling Valve
Employs spring-structured 304 stainless steel valves to ensure rapid, zero-drip filling across your automatic water filling machine.
PLC Touch Screen Control
Features a brand PLC panel for real-time monitoring and swift adaptation with quick-change changeover parts.
Energy Saving & High Efficiency
Driven by an efficient 4.8 kW main motor, delivering continuous 12,000 BPH performance on your 3 in 1 water filling monoblock.
Technical Specifications
| Parameter | XGF 24-24-8 Water Bottling Line |
|---|---|
| Rinsing / Filling / Capping Heads | 24 Rinsing / 24 Filling / 8 Capping Heads |
| Production Capacity (500ml) | 10,000 - 12,000 BPH (Bottles Per Hour) |
| Suitable Bottle Volume | 100 ml - 2000 ml |
| Suitable Bottle Diameter | Ø50–100mm |
| Suitable Bottle Height | H = 150 - 340 mm |
| Cap Specification | Plastic Screw Cap (20 - 50mm) |
| Main Motor Power | 4.8 kW |
| Power Supply | 220V - 480V, 3 Phase, 50/60Hz (Customizable) |
| Machine Dimensions (L \ W \ H) | 2.78 × 2.2 × 2.2 meters |
| Machine Weight | 4,500 kg |
Detail Display
Rinsing Station
Features 24 SUS304 stainless clamps that invert PET bottles 180° for deep internal cleaning with no dead ends.
Filling Station
Houses 24 gravity filling valves in SUS304; easily adapts to different bottle capacities via quick changeover parts.
Capping Station
Equipped with 8 magnetic torque capping heads for precise thread sealing, adjustable via capping molds.
Frequently Asked Questions
Operators can switch bottle sizes by replacing the star-wheel changeover parts and adjusting the height of the filling and capping units.
Standard XGF 24-24-8 production typically takes 30 to 45 business days depending on custom voltage settings and cap specifications.
Yes, we dispatch experienced overseas engineers to your factory for complete equipment installation, line commissioning, and comprehensive operational training for your technical team.
We offer a 12-month warranty, life-long technical support, spare parts delivery, and optional on-site engineer installation and training.
The monoblock includes CIP recycling connections and smooth SUS304 surfaces, facilitating rapid hot water or disinfectant circulation.
